Electric Service Requirements

Do you need to start new electric service? We can help you get plugged in. Before you start the process, check out the links below to get our electric service requirements. Each of the sections of the manual are in PDF format and require a reader for viewing. To download a free reader, visit Adobe's website.

PDF 2016 Electric Service Requirements Manual, 2nd edition


PDF Chapter 1 - General Requirements
PDF Chapter 2 - Permits and Applications
PDF Chapter 3 - Services and Meter Installations
PDF Chapter 4 - Clearances
PDF Chapter 5 - Underground Requirements
PDF Chapter 6 - Temporary Construction Service
PDF Chapter 7 - Residential Single-Family and Duplex Buildings (Dwellings)
PDF Chapter 8 - Multi-Family Residential Buildings
PDF Chapter 9 - Non-Residential Services
PDF Chapter 10 - Special Installations 

 


Related equipment specifications
Approved meter service equipment
PDF PacifiCorp Material Specification ZG 031 High-Density Polyethylene (HDPE) Conduit
PDF PacifiCorp Material Specification ZG 033 Fiberglass Conduit
PDF PacifiCorp Power Delivery Policy 228 - Distribution Spill Prevention Control and Countermeasure (SPCC)
Padvault information for contractors
Padvault information for suppliers
 

ESR White Papers
PDF ESR White Paper: Section 4: Firewalls
PDF ESR White Paper: Section 4: Fuel Storage Tanks
PDF ESR White Paper: Section 4: Gated and Enclosed Spaces
PDF ESR White Paper: Section 4: Pipe Fittings
PDF ESR White Paper: Section 10:Electric Vehicle Charging Stations 

Questions and comments about the ESR book can be submitted via e-mail to:
esrfeedback@pacificorp.com

Net Metering Requirements 

California 

PDF Authorized Generation Types and kW Limits

PDF Net Metering Agreement - Application

Oregon 

PDF Authorized Generation Types and kW Limits

PDF Net Metering Agreement - Application, Level 1: For Inverter Bases Systems 25 kW or smaller

PDF Net Metering Agreement - Application, Level 2: Capacity of 2,000 kW or less

PDF Net Metering Agreement - Application, Level 3: Capacity of 2,000 kW or less

As of September 2007, the Oregon Administrative Rules have defined three different service levels for net metering. Following acceptance your Net Metering Application, your local office will communicate with you to complete an Interconnection Agreement for your level, as well as a Net Metering Agreement

Washington 

PDF Authorized Generation Types and kW Limits

PDF Net Metering Agreement - Application

Customer Service

Customer Service

Customer service
1-888-221-7070

Report a power outage
1-877-508-5088

Report a streetlight outage